Today in Surat of Gujarat, in morning at 9:00 am One of the two 220 MW units of Kakrapar Atomic Power Station KAPS were shut down due to leak in Primary Heat System and a temporary emergency situation was declared. Radioactivity/radiation in the premises and outside were found normal. KAPS-1 and 2 consist of two units of pressurized heavy water reactors.
It there was no radioactive leak and all workers are safe was certified by site director LK Jain.