At a public function in Ahmedabad, Prime Minister will inaugurate the Phase-I of Ahmedabad Metro project. This comprises about 32 km of East-West corridor from Apparel park to Thaltej and North- South corridor between Motera to Gyaspur. The Thaltej-Vastral route in the East-West corridor has 17 stations. This corridor also has a 6.6 km underground section with four stations. The 19 km North-South corridor that connects Gyaspur to Motera Stadium has 15 stations. The entire Phase 1 project is built at a cost of more than Rs. 12,900 crore.
Ahmedabad Metro is a massive state of art infrastructure project involving underground tunnels, viaduct & bridges, elevated and underground station buildings, ballastless rail tracks and driverless train operation compliant rolling stock etc. The metro train set is equipped with an energy efficient propulsion system which can save about 30-35% of energy consumption. The train has a state of art suspension system providing a very smooth riding experience to passengers.
Inauguration of Ahmedabad Phase-1 metro project will provide world class multi modal connectivity to the people of the city. Multi Modal connectivity is being provided with Indian Railways, and Bus system (BRTS, GSRTC and City Bus service). This includes connectivity with BRTS at Ranip, Vadaj, AEC station etc. and with Indian Railways at Gandhidham, Kalupur and Sabarmati station. At Kalupur, the metro line will be connected to the High Speed Rail system connecting Mumbai and Ahmedabad.